Project: Chapel Street Bridge
State: Connecticut
Description:
Penn Hydro’s scope of work on this repair project consists of the removal of deteriorated concrete at an average depth of 3 inches from the bridge deck.



Description:
Penn Hydro’s scope of work on this repair project consists of the removal of deteriorated concrete at an average depth of 3 inches from the bridge deck.