Project: Galleria Mall
 
State: Pennsylvania

 

Description:

 

Penn Hydro’s scope of work on this repair project consists of the removal of overhead deteriorated concrete at an average depth of 3 inches from the spiral ramps. Penn Hydro is also responsible for the collection, debris cleanup, treatment and disposal of the hydrodemolition wastewater.

Contact Estimating 

For All Inquires About Projects Or General Questions Email Us At

estimating@pennhydroinc.com

Follow Us On

Linkedin.png
  • YouTube

Contact Information

Office Address:

210 Federal Street, Suite 200 

Pittsburgh, PA 15212

Tel: 833-GOHYDRO

       (833-464-9376)